Use cases

Built for the practice, not the industry it serves.

Every practice has a short list of things clients ask for that arrive as a spreadsheet and leave as a spreadsheet. These are the ones that come up most often, and what your team hands over instead.

What you can build

All 9, described the way a consultant would.

Isometric drawing of a plant, each building colored by its readiness score, beside an overall score of 86 out of 100

Described as“Score our sites from SAP PM and email the client a status every Monday.”

Operational readiness tracker

Maps a site against a set of readiness criteria, scores each dimension, and generates a live status report.

  • Live from SAP PM
  • Scheduled reports

Replacesa spreadsheet that takes a week to update

Dark-mode compliance app with a glowing likelihood-by-impact risk heatmap and a list of high-risk findings

Described as“Group audit findings by regulation and let owners approve the fixes.”

Regulatory compliance dashboard

Groups audit findings by regulation, surfaces high-risk items, and tracks remediation progress in real time.

  • Approval workflow
  • Audit trail

Replacesa manual review that takes days to consolidate

Phone tilted in 3D showing an offline inspection checklist, with floating cards for the Maximo sync and an automatic work order

Described as“An offline phone checklist for site engineers that writes to Maximo.”

Field inspection app

A mobile form that site engineers fill in during inspections, connected to the client's existing database.

  • Works offline
  • Writes to Maximo

Replacespaper forms and manual data entry

Two 3D database cylinders with records streaming between them, a 99.9991% match rate and one flagged table mismatch

Described as“Compare EBS with S/4HANA, flag every mismatch, sign the evidence.”

Migration validation tool

Compares source and target datasets after a system migration, flags discrepancies, and produces a signed evidence report.

  • Runs on real data
  • E-signature

Replacesa bespoke script that nobody maintains

Transformation roadmap board tilted in perspective, with decision cards standing off it showing approvals

Described as“A secure portal where our execs log and approve decisions.”

Strategy alignment portal

A secure site where a leadership team tracks decisions against a transformation program in real time.

  • Role-based access
  • Approvals

Replacesa shared spreadsheet and a weekly email update

Laptop in 3D showing a client-branded results portal with KPIs, a margin trend and a Microsoft sign-in card

Described as“Our client's SAP and Snowflake data, behind their own sign-in.”

Client reporting dashboard

Connects to the client's existing systems and displays the metrics your engagement is responsible for moving.

  • Client SSO
  • Live connections

Replacesa slide deck that goes stale the moment it leaves the room

A spreadsheet of stores ranked on variance to plan, with a formula bar, filtered row numbers, diverging data bars and a subtotal row, the weakest store highlightedExample Retail · Region North · £000sStore performanceD24fx=C24/B24-1ABCEFGD1StorePlanActualVar %TrendStaff2Northgate184.0199.5+8.4%183Riverside171.0178.2+4.2%164Eastfield163.5168.1+2.8%155Harbour158.0159.6+1.0%1523Dalebrook137.5126.8-7.8%1124Westway131.0111.9-14.6%725SUBTOTAL945.0944.1-0.1%82StoresPlanStaffing24 stores · 6 shown · wk 4 of 4F24 commentWestway · 14.6% underplan, on 7 staffSMStore manager · Wk 4Northgate cleared planRegional manager notified

Described as“Rank our stores on margin and sell-through, and tell each manager what to fix.”

Store performance tracker

Ranks every store on the measures your engagement is moving, and tells a regional manager what to do about the bottom one.

  • Live from POS
  • Store-level actions

Replacesa monthly pack that lands too late to act on

A control room display showing five production stations with one stopped for a changeover, an overall equipment effectiveness figure, and a bar chart of minutes lost by hourExample Industrials · Line 4Line performancePress4,120units this shiftWeld3,980units this shiftPaint1,460changeoverAssembly3,860units this shiftPack3,845units this shiftEQUIPMENT EFFECTIVENESS87.4%+2.1 ptsUnits this shift17,265Target19,500MINUTES LOST BY HOURSHIFT B · 06:00 TO 14:00DowntimePaint changeover ran42 min against 15MTMaintenance · loggedPaint cell back onlineShift lead notified

Described as“Show downtime by line and cause, live from the historian.”

Line performance monitor

Tracks output, downtime and scrap on every line, and attributes the lost hours to a cause the plant team recognizes.

  • Live from the historian
  • Downtime reasons

Replacesa shift report typed up the following morning

A milestone track running into the distance with seven gates, four signed off, one slipped and two still ahead, beside a count of gates signed offExample Agency · Program 2027Program deliveryM-09M-11M-12M-14!M-17M-19M-22GATES SIGNED OFF12 of 17At riskM-17 · legacy extractslipped 6 weeksDLDelivery lead · escalatedSigned offM-12 · Case intake livePDProgram director · Gate 3M-12 signed offOversight board notified

Described as“Track milestones and spend against the business case, and export the evidence.”

Program delivery tracker

Holds a public program against its committed milestones and spend, and produces the evidence an oversight body asks for.

  • Milestone evidence
  • Audit-ready export

Replacesa status pack rebuilt by hand every quarter

By practice

Where firms are putting it to work.

01

Financial services

Regulatory reporting your client can run themselves, risk registers that reconcile against source systems, and remediation tracking an examiner will accept as evidence.

What teams build, and demos

02

Healthcare & life sciences

Accreditation readiness, protocol adherence tracking across sites, and the audit trail a regulator asks for. Built against the client’s own records.

What teams build, and demos

03

Energy & utilities

Asset and outage readiness scored against live field data, and compliance evidence assembled once rather than rebuilt for every submission.

What teams build, and demos

04

Public sector

Program assurance dashboards a minister can read, benefits tracking that survives a change of sponsor, and reporting that does not depend on a contractor staying.

What teams build, and demos

05

Transactions & M&A

Diligence findings that stay live through to integration, synergy tracking against actuals, and a day-one readiness view both sides can see.

What teams build, and demos

06

Industrials & operations

Site readiness, supplier scorecards and throughput reporting connected to the systems already on the plant floor.

What teams build, and demos